Home > Products > Pre-insulated Steel Pipe > Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe

Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe

Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB
Min. Order:
1 Ton
Transportation:
Ocean,Land,Air
Port:
Tianjin Xingang,Dalian,Qingdao
Share:
  • Product Description
Overview
Product Attributes

BrandChengyuanguanye

CertificationAPI

ApplicationFluid Pipe

Section ShapeRound

Surface TreatmentBlack

UsagePipeline Transport

TechniqueERW

MaterialCarbon Steel

Outer Diameter(Round): 114 - 2400 MmThickness: 2 - 30 Mm

Length: 3-12mSecondary Or Not: Non-secondary

Supply Ability & Additional Information

PackagingIn bundles or according customers requirements.

Productivity120000 Tons

TransportationOcean,Land,Air

Place of OriginHebei,China(Mainland)

Supply Ability10000 Tons per Month

CertificateISO9001

HS Code73049000

PortTianjin Xingang,Dalian,Qingdao

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB

Packaging & Delivery
Selling Units:
Ton
Package Type:
In bundles or according customers requirements.

Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe

                                     Hebei Chengyuan Pipe Industry Group Co., Ltd

Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe

1 Product insulation steel pipe
2 Standard U.S.A. ASTM A178/A179/A192/A210/A213/A333/A335/A283/A135/A214/315/A500/A501/A519/A161/A334;  
Japan JIS G3456/G3457/G3458/G3460/3461/3462/3464
German 17175/1629-4/2448/2391/17200  SEW680
3 Material and  Grade U.S.A. A179/A192/T11/T12/T22/P1/FP1/T5/4140/4130
Japan STPG38,STB30,STS38,STB33,STB42,STS49,STBA23,STPA25,STPA23,STBA20
German ST33,ST37,ST35,ST35.8,ST45,ST52,15Mo3,13CrMo44, 1.0309, 1.0305, 1.0405
4 Out Diameter 20mm-1220mm
5 Wall Thickness 2mm-30mm
6 Length 4-12m
7 Protection Plastic caps/ Wooden case
8 Surface Black painting/varnished surface,anti-corrosion oil, galvanized or as per required by customer
9 Packing terms labeled and bundled together with steel strips
10 Shipment terms Containers or bundles by sea,one 20" container can load about 20 tons(5.8meters long),one 40" container can load about 23-26tons(less than 11.8meters long)
11 Marking As per customer`s requirement
12 Production capacity with full production capacity.10,000tons per month.
13 Delivery time Within 30 days after receiving deposit.
14 Main market Asia.India.Middle East.America.Europe
15 Min. Order quantity 5 tons 
16 Quality Certificate ISO, API
Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe diaplaypackage transportation
Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe categoryour advantagePolyurethane Foam Filled Heat Thermal Insulation Steel Pipe informationPolyurethane Foam Filled Heat Thermal Insulation Steel Pipe certificate


Q:Are you a manufacturer or trader?
A:We are a manufacturer ,and we can have our own factory produced many steel products.


Q Whether your company support Trade Assurance order?
A: yes , we can (100% product quality protection;100% on-time shipment protection;

100% payment protection)


Q:Can we get the some samples?Any charges?

A:Yes,you can get available samples in our stock.Free for real samples,but customers need to pay the freight cost.

 

Q How we do business with your company ?
A: send us your requirement which have size , coating info , parameters,qty ,destination port .

CONTACT



Product Categories : Pre-insulated Steel Pipe

Home > Products > Pre-insulated Steel Pipe > Polyurethane Foam Filled Heat Thermal Insulation Steel Pipe
Email to this supplier
  • *Subject:
  • *To:
    Ms. Jia
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send