Home > Products > Plastic Coated Composite Pipe > 1.5 Inch 3 Inch Fbe Coated Steel Pipe

1.5 Inch 3 Inch Fbe Coated Steel Pipe

Payment Type:
L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm:
FOB,CFR,CIF,EXW,FCA,CPT,CIP
Min. Order:
30 Ton
Transportation:
Ocean,Land,Air
Port:
Tianjin Xingang,Dalian,Qingdao
Share:
  • Product Description
Overview
Product Attributes

Model No.Outer Diameter(Round):60~1420mm Thickness:2.5~3.7mm

BrandChengYuan

TypeSeamless

CertificationAPI

ApplicationFluid Pipe

Section ShapeRound

Surface TreatmentBlack

UsageSpecial Purpose

TechniqueERW

MaterialCarbon Steel

Supply Ability & Additional Information

PackagingPlastic caps on both ends,Steel bundle

Productivity120000 Tons

TransportationOcean,Land,Air

Place of OriginHebei,

Supply Ability10000 Tons

CertificateISO9001

HS Code73049000

PortTianjin Xingang,Dalian,Qingdao

Payment TypeL/C,T/T,D/P,Paypal,Money Gram,Western Union

IncotermFOB,CFR,CIF,EXW,FCA,CPT,CIP

Packaging & Delivery
Selling Units:
Ton
Package Type:
Plastic caps on both ends,Steel bundle

                                    1.5 Inch 3 Inch Fbe Coated Steel Pipe


                                                                                                                            Hebei Chengyuan Management Group Co., Ltd.


1 The following construction tools should be selected for coated steel pipe:


(1) Metal saw should be used for cutting.


(2) Special grooving machine should be used for grooving.


(3) Cold bending of pipe bender should be adopted for pipe bending.


(4) Electric threading machine should be used to process pipe threads.


(5) The end of coated steel pipe should be deburred and processed with a file.


(6) Small brushes or toothbrushes should be used in liquid epoxy resin coatings with high strength inorganic solvents.


2  The construction procedure of coated steel pipe shall meet the following requirements:


(1) Coated steel pipes should not be buried in reinforced concrete structural layers;


(2) No welding is allowed in the installation of coated steel pipes.


(3) The installation of coated steel pipe should be gradually connected from large caliber to small caliber, and the nozzle should be blocked in time.


(4) In transportation, loading and unloading and construction of coated steel pipes, throwing and severe impact are strictly prohibited.


(5) When the diameter of coated steel pipe is not greater than DN50, cold bending of pipe bender can be used, but the bending radius of curvature should not be less than 8 times the diameter of pipe, and the bending angle should not be greater than 10 degrees.



3

44567891011


Product Categories : Plastic Coated Composite Pipe

Home > Products > Plastic Coated Composite Pipe > 1.5 Inch 3 Inch Fbe Coated Steel Pipe
Email to this supplier
  • *Subject:
  • *To:
    Ms. Jia
  • *Email:
  • *Message:
    Your message must be between 20-8000 characters
Send Inquiry
*
*

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send